1.The above are typical for a dry limestone with density 1.6 ton/m3.
2.Feed Material should be 0.7 smaller than the crusher's feed opening in at least one dimension.
|
AS AN EXAMPLE, IF DISCHARGE SETTING IS
MEASURED 100mm, MATERIAL OF FOLLOWING GRADATION WILL BE PRODUCED:
SQUARE MESH SIZE |
PERCENT PASSING |
100 mm |
78 % |
50 mm |
41 % |
30 mm |
25 % |
10 mm |
8 % |
|
|